Custom Writing Help For You!

Special Discounts Offers! 20-30% Off!

Posted: June 16th, 2020

Emirates Stadium: Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment

Write my paper – Get Assignment Essay Pro Writers For You Research Papers:

1.0. Introduction

The PMI defines project management as ‘the art of directing and coordinating human and material resources through the life of a project by using modern management techniques to achieve pre-determined goals of scope, cost, time, quality and participant satisfaction’ (Smith 2002)

“Through the project management process, business needs and requirements are transformed into deliverables or outputs the project will provide to meet; this transformation process is made up application of constraints such as time, cost, quality, motivation and application of project management tools and technique.”(APM 2002)

According to Dinsmore, and Cabanis-Brewin (2006), project management processes are grouped into the following areas: they are initiating, planning, executing, monitoring and controlling and closing. A good project manager must be skilled in applying this knowledge and be able to integrate these activities as the project moves through its life cycle.

The aim of this report is to critically evaluate the project management challenges and the management approaches in the construction of Emirate Stadium described in the groups’ presentation. Some of the challenges identified in group discussions includes; time constraints, planning approval, design and site constraints, procurement path, organizational/stakeholders management..This report compares some of the identified challenges with the established best practice in project management.

The second part of the report is develop guideline for the 2012 Olympic Stadium which will include an overview of the difference between managing a single, simple project and a project that is part of a large complex programme of work, also to outline the project management challenges of the 2012 Olympic Stadium.

2.0 The Emirates Stadium

2.1 Background of the Emirate Stadium complex

The need to generate additional revenue from the football event and also to provide a state- of the- art facilities for the fans is identified as the requirement for a new football stadium to replace the existing one .by Arsenal Football Club

The Emirate Stadium is located in Holloway in London Borough of Islington town.

The stadium is located in a high density residential area therefore restricting feasibility of increase capacity. Over 2000 new homes were built in Islington as part of the project.

Two of the key points in the club brief to design team were for the pitch to be as good as Highbury, and to create an exhilarating stadium atmosphere through the design.

Over 2,500 legal documents were signed in order to give the project full clearance.

The overall project put at about 390million pounds. . It was opened in July 2006, with seated capacity of 60,432 making it the fifth largest football stadium in the UK

2.2 Main Project management challenges identified by different groups

Based on the group presentations some of the main project management challenges identified include:

* Time constraints,

* Planning and consent approval,

* Design and site constraints,

* Procurement path,

* Organizational/stakeholders management

* Document control

2.3 Some of the management approaches considered by the group include;

* Involving contractor in early stage of the process

* Design and Build contract

* Site investigation

* Collaborating planning and possible overlap during construction to meet deadline

* Several procurement path

* Involvement of the stakeholders

* Redesigning to suit the shape of the site

* Understanding of the scope of the project.

2.4 Evaluation of project management challenges and approach in the group work

2.4.1. Involving contractor in early stage of the process.

This can help in integrating the contractors idea and expertise in the planning and design process, although, Austin, Baldwin and Wasket (2000) identified that it might result in uneven design workload while they wait for consultant and other contractors to develop their own design, this result in the client paying for retainer while the project is yet to start, thereby increasing the cost of the project. Therefore it might be beneficial to delay the introduction of contractor early

2.4.2 Time constraints

It can be seen that in the case of Emirate stadium, delivering the project on time is very crucial; to enable the club to meet up with football season, Harrison and Lock (2004) stated that delivery a project on time is an extremely important objective to client as well as avoiding the risk of being skimped in respect of quality and reliability of being close to the budget but most time all the objective of the project cannot be met.

2.4.3 Planning and consent approval.

Two sets of people are involved in planning; they the client and the contractor .Obtaining the consent approval and satisfying planning requirement as well as defining the project goals, ensure availability of funds and selecting the design is the primary responsibility of the owner, this is one aspect that group presentations did not consider. On the side of the contractor, proper planning and scheduling contributed to their delivering the project on time.

2.4.4 Contract /procurement strategy

The contract strategy used in the construction of Emirate Stadium is identified as Design and Build. The type of contract is assumed to be the best when time constraint is considered, Rowlison and McDermontt (1999) reported that Design and Build approach involving overlapping of design and construction phases leads to economics and fast project, though the client has to limit the variation to minimum , finds evaluation difficult and also have to make early decisions.

However, Aritua, Bower and Turner (2006) reported that Design and Build procurement options has been criticized for being cost rather than design quality driven.

Chan and Yu-Ann 2005 identified design liability as the most important practical problem encounters in design and build system.

2.5 Best practice in project management

The best practices in project management are those practices that are generally agreed that their application in the project has shown to enhance the chances of success over a wide range of projects. (PMBOK, 2004)

Atkinson (1999) queried, if successful project management means doing something right, that result in a project which was implemented on time, within cost and to a quality parameters requested, but which is not used by the customers, not liked by the sponsors and does not seem to provide either improved effectiveness or efficiency for the organization

Kerzner (2006) affirmed that best practices in project management are those actions or activities undertaken by the company or individual that led to a sustained competitive advantage, it can be learned from both failure and success. Defining project objective at the outset and establishing relative importance of these objectives is crucial (Smith 2002). The Primary objectives of the project are usually measured in terms of time cost and quality, whilst it may be possible to meet one or two of the objectives, meeting all three of them is almost impossible. (Smith, 2002).

However, the general knowledge, skills and processes described in general agreement documents of project management should not always be apply uniformly to all projects, the project manager and the team is responsible for determining the appropriate process and tailored it down to suit the specific project, because every project is unique on its own. (PMBOK, 2004)

3.0 The 2012 Olympic Stadium complex

3.1 The background of the 2010 London Olympic Stadium.

The 2010 London Olympic Stadium is located at the south of Olympic park Stratford, East London. The EDAW consortium working with Arup and Atkins was appointed by Olympic delivery Authority (ODA) to develop the master plan and the design of the Olympic Park, while the design of the Olympic venue or the Athletes Village was tendered separately.

In 2007, The Olympic Delivery Authority Signed a Memorandum of Understanding (MoU) with the consortium known as Team Stadium to design and build the Olympic Stadium. The consortium is made up the designer, Hoks sport. Main contractor Sir Robert McAlphine, structural engineer Burro Happold, service engineer and landscape designer. The project was estimated at 498miliion pound.

The stadium consists of a lower tier of 25000 permanent. Seats set into the landscape with an upper tier of 55000 temporary seats. The sunken bowl built into the ground will contain the field of play and lower permanent seating. However, facilities for athletes within the Stadium include changing rooms, medical support facilities and an 80m warm-up track. Spectator services, refreshments and merchandise outlets will be located outside the venue on a ‘podium’ that will surround the Stadium, rather than being located within the Stadium itself.

Constructions began three months ahead of schedule and it is expected to be completed by 2011.

In addition, construction works in other parts of the Olympic village is still on-going, while some are close to completion, others are yet to start. This is based on the planned milestone schedule set out by the Olympic Delivery Authority., According to the chairman of the Olympic Delivery Authority, some completion date has been moved further, this is to avoid the venue been completed and standing idle in the years before Olympic, as this call for additional cost of maintenance.

(Culled from official site of 2012 Olympic).

3.2. The outline of the Olympic Stadium

“People will be able to see with their own eyes a stadium which is designed to be different: an innovative and sustainable design which uses temporary elements to meet a complex brief, a stadium built for both Games and legacy”.(Olympic Delivery Authority Chairman John Armitt).

The design of London 2012 Olympic Stadium is much more than dazzling or ‘out of this world’ Architectural structure that is norm of modern day Olympic stadium. “The emphasis in the design has been on minimizing the quantity of material, whilst still producing the required performance, ensuring the sustainability of the stadium after the games give rise for incorporation of some temporary structures.

However, design and construction of such large and complex project need effective and efficient management to deliver the agreed scope of the project. The management approach in multi-projects is generally different from single project. Flexibility management process with explicitly define rules and procedure can be a source of success with large complex project. (Dietrich and Lehtonen 2005).

Baccarni (1996) defined project complexity as project that consists of varied interrelated parts and be operationalised in terms of differentiation and interdependency .On the hand Coffman believed that complex project comprises of subset of project that are composed of so many different facets that no individual or small team possesses all of the knowledge, experience, or skills required to design and implement them.

Considering 2012 Olympic Stadium as a part of Olympic park which consists of interrelated and multidisciplinary projects that demand exceptional level of management and system approach which will be described to be inappropriate for a single project… Looking at the technical and organizational complexity of the Olympic park, it is clear that it requires involvement of lots of multi-disciplinary contractors, sub contractors, supply chain, trade, different technology and specialties. Williams (1999) sees technical complexity as a three-fold concept: the variety of task as the degree of interdependencies within these tasks, and the instability of the “assumptions upon which the Tasks are based.” Complex project requires proper structuring and scheduling in terms of Work Break down Structure and further down into related bid package for the qualified construction firms .to bid .For effective organizational management, the services of a planner, scheduler, contract administrator, legal adviser, procurement engineer, accountant will be require in a complex project unlike a single project where all the task will be handle by the project management..

Moreover, managing a large, multi-projects environment or complex projects is refers by some author as programme management, Fern(1991), stated that the common theme of programme management can be identified as the co-ordination of projects’ to gain benefits that it would not be possible to obtain were the projects managed independently. He also defined programme management as the coordinated support, planning, prioritization and monitoring of projects to meet changing business needs. Pellegrinelli(1997) pointed out that programme management is not same as multi-project management, that the nature and practice of program management are much more than resource management though management of scares resources or the establishment of appropriate information system is identified as core elements of programme management. Fern (1991), proposed single objective programme model as one of the generic models to describe how organizations define and practice programme management. According to Fern (1991), programme with single objective are often called macro-project or simple project which consists of large numbers of project which run concurrently, often employ large numbers of contractors and can benefit from programme management techniques.

Furthermore, the differences between managing a simple project and a project that is part of a large complex programme, can be identify in the description of project and program by Pellegrinelli(1997) and Fern (1991), which states that project is a group of related task(activities) which together satisfy one or more objectives, while programme is a frame work for grouping existing projects (or defining new projects) and for focusing all the activities required to achieve a set of major benefits.

Some of features of managing a simple single project include project manager been responsible for directing and coordinating human and material resources throughout the life of a project by using modern management techniques to achieve predetermined objectives, while a large complex programme involves having a programme manager facilitates the interaction of other managers and team manager responsible for work package.

In addition, a single simple project have a set objective and self dependent for delivery, which entails, ensuring that trade-offs between scope, quality, time and cost are satisfactory and acceptable(Wideman,1990), while multi-project is interrelated and interdependent with other project in the programme. Significant increase in the number and independence of element between disparate project within a programme raise structural complexity to a level higher than that of single projects (Blismas et al 2004)

A single project has a linear life cycle and fixed duration in which performance of the project is measured; while in multi-project duration depends on the delivery of the entire project in the programme

Single project involves one main contractor with few sub contractors while multi-project involves large number of contractor, sub contractors and supply chain.

Other features of a single project includes managing risk and uncertainties in line with the project scope and objectives, abbreviated planning process and Single client management

In addition, scheduling and resources allocated is more complex than that of a single project the need and priority of a particular project is considered, detailed communication, organization and strategic management, multi-stakeholders management, development of software for project planning/scheduling and system control.

3.3. GUIDELINES FOR 2012 OLYMPIC STADIUM

The purpose of these guidelines is to help in organizing, planning and control 2012 Olympic Stadium to achieve the project objectives. The guideline covers the life cycle of the project from initiation, planning, execution, monitoring and controlling and closure of the project.

3.3.1 Initiation

* This is the beginning of the planning phase, the need is identified, resources, preliminary drawing and block diagram is produce, analysis including budget estimation, project charter including cost, task, and deliverable schedule, scope is defined and impact assessment initiated, conceptual design created followed by detailed design and planning

3.3.2 Project planning

This include developing management Plan, scope planning and definition, creating a Work Breakdown Structure (WBS), activity definition and sequencing, Resource estimating and allocation, Estimating budget and cost control, activity duration estimating, schedule development, human resource and communication planning, risk management planning, contracting, purchases plan (PMBOK, 2004)

* Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Plan: is necessary for the development of preliminary project scope statement, project management processes, environmental factors and organizational process assets. (PMBOK, 2004)

Scope planning and definition is essential for creating project scope management plan that documents how the project scope will be defined, verified and controlled and also the creation and definition of WBS. Secondly development of detailed scope statement as basis for future project decisions. (PMBOK, 2004)

* Work Breakdown Structure (WBS): “Developing WBS with a corresponding project organizations and functional responsibility chart (Wideman,1990) Establishing the programme work breakdown structure and breaking it into work package for contract purposes”. (Wideman,1990)

Activity definition and sequencing is crucial in identifying specific activities that needs to be performed to achieve project deliverable and also identifying and documenting dependencies among schedule activities. It contains the activity list and attributes, milestone list, requested change and approved change requests project schedule network diagram. (PMBOK, 2004)

* Resource estimating and allocation is important in estimating the type and quantities of resources required by each work package

* Estimating budget and cost control: Each work package is treated essentially as a separate and autonomous effort requiring resources and input from variety of source (Clough et al, 2000).”At the earliest possible time, an acceptable program budget breakdown must be established, which properly reflects the best estimate of the work required to achieve the overall project objectives. This will form the basis for regular cost monitoring and reporting” (Wideman, 1990)

* Contracting, purchases plan: Laws and regulations will require public bidding procedure in the government owned project. Advertisements of the project are required to ensure that all contractors who might have interest are offered equal opportunity to bid. A number of work packages may be assembled into a contract package for procurement purposes(Wideman,1990) Type of contract strategy and procurement route to be use and allocation of risk of project is identified

* Human resource and communication planning: this is necessary in identifying and documenting roles and responsibilities and reporting relationships, secondly. Information and communication needs of the projects stakeholders are determined. (PMBOK, 2004)

* Risk management: The purpose of risk management process is to make effective project management decisions about what happens on the project in future. This consist of risk source identification, risk impact assessment and analysis and managerial response to risk in the context of the project (Smith, Merna, Jobling, 2006)

3.3.3 Execution stage

This involves coordinating people and resources, integrating and performing other project activities. Some of the activities of this stage include Directing and managing project execution, performing quality assurance, acquiring and developing project team, information distribution. Selection of consultant, supply chain contractors and sub contractors. (PMBOK, 2004)

· Directing and managing project execution. This process is necessary for directing the various technical and organizational interfaces that exist in the project to execute the work defined in the project management plan. Some of the activities here consist of approving corrective and preventive actions, approving change request and defect repair, validating defect repair, administrative closure procedure. (PMBOK, 2004)

· Acquiring and developing project team: this is essential for obtaining human resources needed to deliver the project and also for improving the competencies and interaction of team members to enhance project performance. (PMBOK, 2004)

· Information distribution: design and foster intensive, open and timely communication within the project stakeholders. Employ multiple channels and mediums, in particular modern information technology and extensive face-to face interactions.

Prepare systems that prescribe for most processes simple and brief procedures for flexibility of details. Restrict optimization to the essential.

* Selection of consultant, supply chain contractors and sub contractors. This process is essential for reviewing bids and proposal, selecting from among the potential contractors and negotiating a written contract, it also entail risk allocation between the client and the contractor. (PMBOK, 2004)

3.3.4 Monitoring and controlling

This process is crucial for collecting, measuring and dissemination performance information, and assessing measurements and trends to effect process improvement

Integration and ongoing progress is monitored against agreed milestones, results reported in accordance with mechanisms identified in the communication plan.Secondly monitoring changes and recommending preventive action in anticipation of possible problem is an important element of monitoring and controlling (PMBOK, 2004)

3.3.5

Health and safety and environment Maintenance of health and safety on the site is vital for a successful project delivery. Mandatory personal protective equipment for all the workers on site is necessary Also all the site machine and equipment should be working properly. Workers should be properly trained to use the equipments.

3.3.6 Project closure:

this involves closing of project and contract closure. It is necessary for finalizing all activities, completing and settling each contract, including the resolution of any open items and closing each contract applicable to the project. (PMBOK, 2004

3.4 Outline of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Challenges 2012 Olympic Stadium

Some of the project management challenges:

Design constraints:

* This involves getting an aesthetics design which depicts legacy of modern day and world class Olympics, as well as being iconic, environmentally friendly and sustainable in terms of future use and maintenance.

* Time constraints;

Meeting deadline for the project for the Olympics events is very crucial and one is of the major indicator of measuring success or failure of the project.

* Site constraints

The soil/site ground is poor from engineering and environmental viewpoint. Owing to past use of the site which resulted in uneven settlement that can only support very light construction. Site is located between two branches of River Lea an old embankment containing sewage artery. The above constraints call for redesigning to suit the site location and environment.

* Complexity of the project

The multi-project nature of the project involves managing large numbers of subcontractors and supply chain. The construction of the stadium is just one component in the Olympic park,

* Resource allocation and scheduling

Efficient allocation of resources in multi-project environment is a major challenge facing the programme manager, as this can lead to success or failure of the projects.

* Global recession and price inflation

The world economic crisis of 2009 is a major challenge for the project, as this will cause price inflation for goods and services required for the project. The initial project estimate will no longer be feasible.

* Stakeholders’ management

The project has different level of stakeholder. They include the financier, the host community, the supporters, the critics, the press and the general public.

* Project Co-ordination and document control..

The complexity of the project comprises large number of document which might have minor and major changes from the initial design that need to be communicated to people involve with the project.

* Logistics Challenges

Transportation of huge numbers of workers and materials to the site using the existing means of transportation, amid the busy city of London.

* Health and Safety

Maintaining safety in the site is a major challenge in construction site with large number of workers and ensuring that all contractors adhere to the health and safety rule in the site.

3.5 Conclusion

The facts remains that projects are distinctive and unique in their own way. Project life-cycle as well as their requirements is different from each other. What worked for one organization in a particular project might not work for another; it all depends on the organizational culture and values, project environment, interpersonal skill, etc. The general guideline as contained in the Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Body of knowledge is only to serve as a guide that needs to be tailored down to suit a particular project.

Also it can be seen that project management is more of a practical discipline than theoretical, this can be deduce from the uniqueness of every projects, because change is inherent in any project. There must be a change from the laid down planned and schedule strategy, change therefore cannot be eliminated, most especially in construction because of the project uncertainty, it is expected that plan must change. The ability of the project manager to apply the principles of risk management and improve effective change management will determine result of the project.

REFERENCES

ARITUA B.,BOWER D.,TURNER M(2008) Managing the Delivery of Iconic Football Stadiums in England Proceeding of ICE management, procurement and Law 000 paper 700026

ARITUA B., SMITH N.J., BOWER D., (2009) Construction Client Multi-Projects A Complex Adaptive Systems Perspective, International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment 27

ASSOCIATION OF PROJECT MANAGEMENT (2002) Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Pathway APM Great Britain

ATKINSON R (1999), Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment: Cost, Time and Quality, Two Best Guesses and A Phenomenon, It’s Time to Accept Other Success Criteria. International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment, volume 17, 6.

AUSTRALIAN NATIONAL TRAINING AUTHORITY (2004) Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage Complex Projects PSP04, Public Sector Training Package.

AUSTIN S., BALDWIN A., WASKET P,(2000) Integrated Design in the Project Process. Proceeding of ICE

BACCARINI D., (1996).The Concept of Project Complexity a Review, International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment, vol 14,4.

BARBER P., TOMKINS C., GRAVES A. (1999), Decentralized Site Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment—a case study. International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Volume 17.2

BLISMAS N.G., et. al (2004). Factors Influencing Project Delivery within Construction Clients’ Multi-Project,. Engineering Construction and Architectural Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment vol.11,.2.

BOWER D., (2009), Learning Resource in Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment, School of Civil Engineering, Leeds, U.K

CHAN E.,H.,W., YU-ANN T.,W.(2005) Contract Strategy for Design Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment in Design and Build. International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment, Vol 23, 8.

CLOUGH R., SEARS G., A., SEAR S., K., (2000) Construction Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment 4ed John Weily &sons USA.

COFFMAN B S Facilitating Collaboration in the Design Stage of Complex, Multi-stakeholder Projects.. : www.innovationlabs.com/Facilitating_Complex_Projects_v2.pdf accessed online 18th December. 2009

DIETRICH P., LEHTONEN P., (2005) Successful Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment of Strategic Intentions through Multi Project -Reflection on empirical study International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Volume 23.

DINSMORE, P C, CABANIS-BREWIN -J (2006).The AMA Handbook of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment 2nd ed. Amacon USA.. EMIRATES stadium history

FERNS D.C., (1991) Development in Programme Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment, Vol 9, 3

HARRISON F, LOCK D, (2004)., Advance Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment -A Structured Approach 4th Ed. Gower Publisher Ltd, England.

KERZNER H. (2006) Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment: A System Approach to Planning, Scheduling and Controlling. John Wiley & Sons Inc. New Jersey.

LAUFER A., DENKER G., R., SHENHAR A (1996) J. Simultaneous Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment: the Key to Excellence in Capital Projects International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Vol. 14, No. 4,

MORRIS P., W., G. (1994), The Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment of Project. Thomas Telford Book, London

MORRIS P. W.G. (2001) Updating the Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Bodies of Knowledge. Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Journal, – indeco.co.uk Centre for Research in the Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment of Projects, UMIST

PELLEGRINELLI S. et al (2007) The Importance of Context in Programme Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment: An empirical review of programme practices, International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment., Vol 25

PELLEGRINELLI S.(2002) Shaping Context: the role and challenge for programme. International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment, Vol 20

PELLEGRINELLI S (1997) Programme Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment: organizing project-based change, International Journal of Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment, Vol 15,3

PMI Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Institution (2004) A Guide to the Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment Body of Knowledge 3rd edition, (USA) Pennsylvania

ROWLINSON S.MCDERMNOTT P.(1999) Procurement System: A Guide to Best Practice in Construction.edt, E&FNspon London.

SMITH N., J., MERNA T., JOBLING P. (2006) , Managing Risk in Construction Project. Blackwell Publisher, Ltd.U.K.

WIDEMAN R., M. (1990), Total Project Get research paper samples and course-specific study resources under   homework for you course hero writing service – Manage ment of Complex Projects Improving Performance with Modern Techniques. AEW Services, Vancouver,

WILLIAMS T .M.(1999),The Need for New Paradigms for Complex Projects, Elsevier Science Ltd and IPMA. A Vol. 17, No. 5,

Olympic Park Construction gets early start Http://www.london2012.com/…/olympic-park-construction-gets-early-start.php. Accessed on 11th November, 2009.

Countdown to 2012, London’s Olympic Stadium (2008),, http://www.building.co.uk/story.asp? Accessed on 17th December, 2009

Emirates stadium history www.arsenal.com/emirates-stadium Accessed on 4th December, 2009

Order for this Paper or similar Answer/Assignment Writing Service

Place your order by filling a guided instructions form in 3 easy steps.

Why choose our Study Bay Services?

Like every student, Focusing on achieving the best grades is our main goal

Top Essay Writers

We have carefully cultivated a team of exceptional academic writers, each with specialized expertise in particular subject areas and a proven track record of research writing excellence. Our writers undergo rigorous screening and evaluation to ensure they hold relevant advanced degrees and demonstrate mastery of English grammar, citation style, and research methodology. Recent projects completed by our writers include research papers on topics such as sustainable energy policy, cognitive behavioral therapy, and molecular genetics.

Student-Based Prices

We prioritize attracting highly skilled writers through competitive pay and strive to offer the most cost-effective services for students. References from recent years include surveys of customer satisfaction with online writing services conducted by the American Customer Satisfaction Index between 2018 to 2022, demonstrating our commitment to balancing affordable costs with high standards of work through positive reviews and retention of expert writers.

100% Plagiarism-Free

We guarantee 100% original and plagiarism-free final work through a thorough scanning of every draft copy using advanced plagiarism detection software before release, ensuring authentic and high-quality content for our valued customers. To note, we also do not generate assignment content with AI tool, thus you a guaranteed 0% similarity index for your final research paper.

How it works

When you decide to place an order with Study Pro Essay, here is what happens:

Complete the Order Form

You will complete our order form, filling in all of the fields and giving us as much detail as possible.

Assignment of Writer

We analyze your order and match it with a writer who has the unique qualifications to complete it, and he begins from scratch.

Order in Production and Delivered

You and,the support and your writer communicate directly during the process, and, once you receive the final draft, you either approve it or ask for revisions.

Giving us Feedback (and other options)

We want to know how your experience went. You can read other clients’ testimonials too. And among many options, you can choose a favorite writer.